Day 12: Positive Outcome

Today, while the electrical committee continued to work on the problems with the electrical board, the mechanical committee worked on the intake and shooter design. The intake (above) was finished today, and the shooter design was improved. At the end of the day, we were able to solve all electrical problems with Protobot. Now the mechanical committee, first thing tomorrow, has to check on a transmission. After that, Protobot should be driving.